Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 2022-07-12 00:00:00
Canada CanadaBuys

Fort Providence, NWT Airport Instrument Area Installation (5000067041)

Process Number PW-22-01001172

Dates:


Publication date:

2022-07-12 00:00:00

Amendment date:

None

Date closing:

2022/08/02 15:00 Eastern Daylight Time (EDT)

Details:


Region of delivery:

Northwest Territories

End user entity:

Environment Canada

Procurement entity:

Environment Canada

Region of opportunity:

Canada

Tendering procedure:

Open

Reference number:

PW-22-01001172

Solicitation number:

5000067041

Description:


Description:

Background: Environment and Climate Change Canada will be installing an automatic weather station at Fort Providence, NWT. We require that all bases have power and signal cable. All cable must be trenched in according to code. All power cable must be terminated appropriately. Environment and Climate Change Canada requires a main power line to be run and the connection to the electrical grid coordinated between the Contractor and power supplier. All work must be performed to the Canadian Electrical Code. The Technical Authority will be on site for all work. Objectives: 100 amp (single phase) 120V service panel with a minimum of 12 breaker positions housed within appropriate enclosure. (actual requirement is 40 amp) Contractor to supply service panel, GFCI breakers, supply meter housing and appropriate disconnect switch. Teck connectors for panel for 2C12 cable supplied by Contractor Panel to be located behind Environment and Climate Change Canada main instrumentation box (L1,L2). Panel can be installed on same mounting poles or as required. Main power line to be run and be ready to connect to grid. Apply for all necessary permits with APPROPRIATE ENTITIES on ECCCs behalf. Coordinate connection to main power grid with appropriate utility company. Excavation and installation of concrete piles as in notes below. Trenching and cable installation as in notes below.

Contact information:


Contact name:

Noble, Heidi

Contact email:

Heidi.Noble@ec.gc.ca

Contact phone:

Contact address:

Contact Fax:

Solicitation Documents:


File Amendment Number Language Date added
5000067041_tender_en.pdf 000 English 2022-07-12
5000067041_tender_fr.pdf 000 French 2022-07-12

Attachments:


File Amendment Number Language Date added
05_msc_aws_engineering_drawings_-_standard_layout_and_piles_bilingual.pdf Not available Bilingual 2022-07-12