Publication: 2021-11-26 00:00:00
Canada CanadaBuys

Port aux Basques – MCTS Snow Removal and Ice Control (30001323)

Process Number PW-21-00976139

Dates:


Publication date:

2021-11-26 00:00:00

Amendment date:

None

Date closing:

2021/12/14 14:00 Atlantic Standard Time (AST)

Details:


Region of delivery:

Newfoundland and Labrador

End user entity:

Fisheries and Oceans Canada

Procurement entity:

Fisheries and Oceans Canada

Region of opportunity:

Canada

Tendering procedure:

Open

Reference number:

PW-21-00976139

Solicitation number:

30001323

Description:


Description:

STATEMENT OF WORK Contract Title Port-aux-Basques - MCTS Snow Clearing & Ice Control. Contract Period & Hours of Work Snow clearing and Ice control to be carried out Twenty-four (24) hours a day, seven (7) days a week. The work should be completed prior to shift change at 7:30 am and again prior to 7:30 pm to ensure the main doorways are free of snow & ice. Contractor is also required to conduct regular inspections of the premises to ensure that snow and de-icing activities are undertaken in addition to the shift change time frames. The quoted rates will be in effect for the entire period of time. Location of Work .1 Port-aux-Basques MCTS Centre (Old) 49 Stadium Road Channel Port-aux-Basques, NL A0M 1C0 Geographical Coordinates: Latitude = 47.57194, Longitude = -59.13250 .2 Port-aux-Basques MCTS Centre (New) 312 Grand Bay West Road Grand Bay East, NL A0N 1K0 Geographical Coordinates: Latitude = 47.58564, Longitude = -59.19033 *See annex ”E” for additional location references Objectives of the Requirement The objective is to have a qualified contactor to provide Snow Clearing & Ice Control Services at the two (2) MCTS Centres, located in Port-aux-Basques, NL. The Contractor is to submit a proposal showing the detailed cost estimate of all services described within this “Scope of Work” prior to commencing with any work. Itemize individual estimated costs for all components of the work (e.g.: estimated hours of work or cost per visit). For the purposes of costing, contractor to allow for one (1) site visit. Scope of Work The Scope of Work shall consist of the following: 1 Snow Clearing Remove snow and ice, supply and spread salt, or a mixture of sand and salt to prevent slippery conditions on all driveways, parking areas, trucking/loading areas, main entrances including all building exits, exterior stairwells and vehicle entrances and exits. All pathways and areas around the fire hydrants must be kept clear and accessible. Snow clearing operations will commence when 3-5 cm of snow has accumulated, when drifting necessitates such action and/or when deemed necessary by the Departmental Representative. The equipment to be used will be either front end loader, backhoe or truck with adequate size plow to properly clear the surface required. Heavy equipment that would cause damage to metal grills shall not be used for cleaning snow. Snow and ice control to be completed every day prior to shift change at 7:30 am and again prior to 7:30 pm to ensure the main door ways are free of snow & ice. Contractor is also required to conduct regular inspections of the premises to ensure that snow and de-icing activities are undertaken in addition to the shift change time frames. All snow may have to be trucked away and dumped in an approved location, under the direction of the Departmental Representative. The Contractor must obtain approval from the local municipality as to the location for dumping of snow. The work includes the provision of all labour, materials, and equipment necessary. Snow must not be piled against fences or other structures in a manner that may lead to damage to these structures. Caution must be taken as not to block hydrant area with snow or ice. Any damages resulting from or attributed to the contractor`s actions are to be made good by the contractor, at no extra cost to the Department. The contractor is to provide and install markers to identify the location of curbs, planters, fire hydrants, valve boxes, catch basins, storm sewers, manholes, etc, to prevent damage and maintain each in an accessible and workable condition. Drainage areas such as catch basin inlets and curbs must be kept clear and operational to accommodate runoff. 2 Ice Control De-icing and salting operations shall be provided as required or when conditions are deemed necessary by the Departmental Representative. Salt shall be used for ice control around walkways. Salt and salt/sand for ice control on roads, approaches, parking lots and sidewalks shall spread by means of mechanical spreader. The sand will need to be cleaned up & removed after every winter. Partial ice control is the control of all ice and slippery areas on all but a flood coat condition. Constraints All detailed work must be completed within timelines noted in section 2.0 to comply with the safety of our tenants and the operation of the building. Departmental Support RPSS will respond to contractor requests ASAP. Departmental Responsibilities RPSS will be responsible for contract administration i.e. approval of change orders, processing progress claims and other administrative tasks. Contractors Responsibilities Note: Any sub contractors or consultants engaged by the prime contractor shall conform to the documents noted above in addition to all applicable federal, provincial, and local by-laws/ regulations. The contractor will be responsible for their own health and safety when on site. The contractor shall report immediately report, any problems to the Project Authority (RPSS), so the appropriate action can be taken to ensure the work can be completed within the contract period. Notify the Project Authority (RPSS) of any work that that does not comply with the project specifications and drawings, and subsequently recommend corrective action.

Contact information:


Contact name:

Plante, Karine

Contact email:

DFOtenders-soumissionsMPO@dfo-mpo.gc.ca

Contact phone:

Contact address:

301 Bishop drive Fredericton NB E3C 2M6 CA

Contact Fax:

Solicitation Documents:


File Amendment Number Language Date added
30001323_-_ddp.pdf 000 French 2021-11-26
30001323_-_rfp.pdf 000 English 2021-11-26