Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 2021-10-20 16:24:00
United States SAM

Furnish and Install Electrical Distribution Panel and Distribution Panel Feeder Circuit.

Process Number 6923G520P0134

USA

Dates:


Notice ID:

6923G520P0134

Department/Ind. Agency:

TRANSPORTATION, DEPARTMENT OF

Sub-tier:

TRANSPORTATION, DEPARTMENT OF

Sub Command:

6923G5 ST LAWRENCE SWY DEV CORP

Office:

6923G5 ST LAWRENCE SWY DEV CORP

General Information:


All Dates/Times are:

(UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA

Updated Published Date:

(UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA

Original Published Date:

2021-10-20 16:24:00

Original Response Date:

Nov 04, 2021 04:30 pm EDT

Inactive Policy:

15 days after response date

Original Inactive Date:

Nov 19, 2021

Initiative:
  • None***--***

Classification:


Original Set Aside:

Total Small Business Set-Aside (FAR 19.5)

Product Service Code:

N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

NAICS Code:

238210 - Electrical Contractors and Other Wiring Installation Contractors

Description:


Original Set Aside:

The Great Lakes Saint Lawrence Seaway Development Corporation(GLS) has a requirement to increase the scope of an active contract to approximately $30,000.00. The original contract was not posted to the Government Point of Entry(GPE) at sam.gov because the proposed contract action did not meet the dollar threshold (less than $25,000) in FAR 5.101(a) (1) for synopsis. However, it was completed under simplified acquisition procedures, and three offers were received. After the work on the original contract was at approximately 70% completion, unrelated ground contamination was discovered at the worksite, and all work came to a stop. On or about June 06, 2021, GLS launched an investigation into the extent of the contamination. The result of the investigation was full remediation of the worksite and surrounding areas. Remediation involved removing approximately 3,350 tons of contaminated soil and was not completed until October 09, 2021. During remediation, some of the current contractor's work was removed and destroyed for and during remediation. This work must now be completed again at the cost of the government. Also, there was a conduit and other materials removed and destroyed for remediation that was intended for reuse in the original contract. It is in the best interest of the government for the current contractor to repair and replace this material as part of their work. The GLS intends to award the additional work to S&L Electric, Inc., Colton, NY. The new contract period of performance competion date is expected to be November 30, 2021. Point of Contact: Jason Brockway, Phone: (315)764-3252, Email: jason.brockway@dot.gov

Attachments / Links:


Document Size Updated date Download

Contact Information:


180 ANDREWS STREET

MASSENA , NY 13662

USA

Primary Point of Contacts:

Jason C. Brockway

Secondary Point of Contact:

Katie Maloney