Repair/Restore Pest Management Facility
Process Number FA481922R0015
Dates:
FA481922R0015
Department/Ind. Agency:DEPT OF DEFENSE
Sub-tier:DEPT OF DEFENSE
Sub Command:FA4819 325 CONS PKP
Office:FA4819 325 CONS PKP
General Information:
(utc-05:00) central standard time, chicago, usa
Updated Published Date:jun 29, 2022 03:30 pm cdt
Original Published Date:2022-06-03 16:23:00
Original Response Date:jul 06, 2022 02:00 pm cdt
Inactive Policy:15 days after date offers due
Updated Inactive Date:jul 28, 2022
Original Inactive Date:jul 21, 2022
Initiative:- None***--***
Classification:
historically underutilized business (hubzone) set-aside (far 19.13)
Product Service Code:y1jz - construction of miscellaneous buildings
Description:
29 June 2022 The purpose of Amendment 0003 is to include the following changes: - Upload Q and A Part 2 - Upload updated Attachment 5 Section Land M 29 Jun 22 *************************************************************************************************************************************************** 22 June 2022 The purpose of Amendment 0002 is to include the following change: -Upload Q and A Document ***************************************************************************************************************************************************** 15 June 2022 The purpose of Amendment 0001 is to include the following changes: - SOW -- Page 4, para 1.0.A: Added new compound fencing and two new pre-engineered support structures. - Appendix A -- Page 3, para 1.0.A: added the requirement to remove and replace the compound fence and to build the two pre-engineered support structures. -- Page 4, para 1.0.B.7: added note about phasing as it involves the fence and the two pre-engineered structures. -- Page 4, para 1.2.B: added note stating a recent asbestos and lead survey is provided in Appendix C. -- Page 21, para 2.6.E: added comment concerning turtle friendly lighting on gulf side in reference to the exterior light. -- Page 23: Added paragraph 2.8 to explain the two pre-engineered structures. - Appendix B -- Adding drawing to depict two pre-engineered support structures, fence, and dry swale. - Upload Site Visit Sign-in Sheet - Extend proposal due date to 13 July 2022 at 1400 CST *************************************************************************************************************************************************** This is a Design-Build project to repair and restore the Pest Management Facility with a period of performance of 365 days from date of Notice to Proceed receipt. The project is comprised of work on Tyndall AFB and the related disciplines of work as specific tasks in Scope of Work. A. NAICS 236220 - Commercial and Institutional Building Construction B. The resulting contract will be a firm-fixed price contract. See section J for applicable attachments. C. This acquisition has been designated for procurement as a HUB-Zone Set-aside and will be awarded via request for proposal IAW FAR Part 15. D. The project magnitude for this requirement is IAW FAR 36.204(f) between $800,000 and $2,000,000. E. Performance and Payment Bonds shall be obtained IAW FAR 28.102. F. The construction wage requirements statute (DAVIS-Bacon) FL20220005, Building applies to this project. G. The Period of Performance is 365 Calendar Days after Notice to Proceed (NTP). H. A site visit will be conducted with the end user, contractor, CE and CONS as described in Section L.
Attachments / Links:
Document | Size | Updated date | Download |
---|
Contact Information:
BLDG 36235 CP 850-283-8643 105 MISSISSIPPI RD
TYNDALL AFB , FL 32403-5521
USA
Primary Point of Contacts:1st Lt Dan White
Secondary Point of Contact:Bernard D. Husted