Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 2022-07-21 10:26:00
United States SAM

16--COMPUTER,DIGITAL,VA, IN REPAIR/MODIFICATION OF

Process Number N0038322RN644

USA

Dates:


Notice ID:

N0038322RN644

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

NAVSUP WEAPON SYSTEMS SUPPORT

Office:

NAVSUP WEAPON SYSTEMS SUPPORT

General Information:


All Dates/Times are:

(utc-04:00) eastern standard time, new york, usa

Updated Published Date:

(utc-04:00) eastern standard time, new york, usa

Original Published Date:

2022-07-21 10:26:00

Original Response Date:

aug 18, 2022 01:00 am edt

Inactive Policy:

15 days after date offers due

Original Inactive Date:

sep 02, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

1680 - miscellaneous aircraft accessories and components

Description:


Original Set Aside:

CONTACT INFORMATION|4|n731.41|n00383|2156970283|brittany.n.wood14.civ@us.navy.mil| This is a repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: X250 Days 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Attachments / Links:


Document Size Updated date Download

Contact Information:


PHILADELPHIA 700 ROBBINS AVENUE

PHILADELPHIA , PA 19111-5098

USA

Primary Point of Contacts:

Telephone: 2156970283