Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Kuwait Transmitting Station Expansion Project

Process Number 951700-22-R-0004

USA

Dates:


Notice ID:

951700-22-R-0004

Department/Ind. Agency:

UNITED STATES AGENCY FOR GLOBAL MEDIA, BBG

Sub-tier:

UNITED STATES AGENCY FOR GLOBAL MEDIA, BBG

Sub Command:

OFFICE OF CONTRACTS

Office:

OFFICE OF CONTRACTS

General Information:


All Dates/Times are:

(utc-04:00) eastern standard time, new york, usa

Updated Published Date:

jun 02, 2022 10:24 am edt

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

apr 15, 2022 01:00 pm edt

Inactive Policy:

15 days after date offers due

Updated Inactive Date:

jun 25, 2022

Original Inactive Date:

apr 30, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

z2az - repair or alteration of other administrative facilities and service buildings

Description:


Original Set Aside:

The work of this project is defined by the Contract documents and consists of a new addition to the existing transmitter building in Kuwait. The new building addition and site work consists of a pre-engineered metal building with concrete foundation work and floor slabs, interior division walls, and finishes, all civil, structural, architectural, electrical and mechanical/HVAC and other work as described in the contract documents, scope of work, architect and engineering drawings and specifications. The major items of work of the project include but are not limited to the following: The contractor is responsible to furnish, install all items of work indicated in the construction documents. Any item not specifically indicated or mentioned herein or elsewhere in the contract documents but necessary for a complete construction and operation of each system shall be provided by the contractor.

Attachments / Links:


Document Size Updated date Download

Contact Information:


330 INDEPENDENCE AVENUE, SW

WASHINGTON , DC 20237

USA

Primary Point of Contacts:

David Wallace

Secondary Point of Contact:

John Hoddinott, Contracting Officer