Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RPR) Phase V, Capital Power Plant

Process Number AOCACB22R0043

USA

Dates:


Notice ID:

AOCACB22R0043

Department/Ind. Agency:

ARCHITECT OF THE CAPITOL

Sub-tier:

ARCHITECT OF THE CAPITOL

Sub Command:

ACQUISITION & MATERIAL MAN DIV

Office:

ACQUISITION & MATERIAL MAN DIV

General Information:


All Dates/Times are:

(utc-04:00) eastern standard time, new york, usa

Updated Published Date:

mar 17, 2022 02:00 pm edt

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

mar 25, 2022 04:00 pm edt

Inactive Policy:

15 days after date offers due

Updated Inactive Date:

apr 09, 2022

Original Inactive Date:

apr 09, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

y1jz - construction of miscellaneous buildings

Description:


Original Set Aside:

This is the Soliciation for the Architect of the Capitol has a requirement for Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RFP) Phase V, Capital Power Plant (CPP) (Project Number PP 08001J) – Construction Services involves the revitalization of the West Refrigeration Plant (WRP) and limited work in the West Refrigeration Plant Expansion (WRPE). All work will occur within an existing and fully operational plant. The project, including Base Bid and all Options is expected to be $10M and above. This phase shall include the following: Base Bid: Demolition and replacement of Chilled Water Piping in the WRP basement. Work will include piping 42” diameter and below, to include insulation, jacketing, and miscellaneous devices and valves as described in construction documents. 1. Sub-Option A: Condenser Water piping (Basement). This sub-option includes the demolition and new work construction of the condenser water piping in the Basement Level of the WRP only. 2. Sub-Option B: Condenser Water piping (First Floor). This sub-option includes the demolition and new work construction of the condenser water piping on the First Floor of the WRP only. 3. Sub-Option C: WRP condenser water filtration system. This sub-option includes the new work construction of the condenser water traveling screen filtration system located in the Basement Level of the WRP only. 4. Sub-Option D: WRPE condenser water filtration system. This sub-option includes the new work and limited demolition construction of the condenser water traveling screen filtration system located in the Basement Level of the WRPE only. 5. Sub-Option E: WRP/WRPE ball cleaner system. This sub-option includes the new work and limited demolition construction of the ball cleaner system located on the First Floors of the WRP and WRPE. 6. Sub-Option F: WRPE Electro Cell Particle Precipitator Filter. This sub-option includes the demolition and new work construction of the electro cell particle precipitator filter system for the condenser water located in the Basement Levels of the WRP and WRPE. 7. Sub-Option G: WRPE Piping Seismic Supports. This sub-option includes the new work construction costs to install seismic supports to the existing chilled water and condenser water piping on the WRPE’s Basement Level and First Floor. Construction Duration – Base Bid: The construction duration for completion of the base bid shall be no more than 548 calendar days (18 months) from the Notice to Proceed (NTP). Bid Options will be awarded within one calendar year from Base Bid NTP. Project duration for bid options varies depending on timing of award, not to exceed 912 calendar days (30 months) from Base Bid if awarded one year from Base Bid NTP.

Attachments / Links:


Document Size Updated date Download

Contact Information:


2nd & D Streets, SW FHOB - Room 264

Washington , DC 20515

USA

Primary Point of Contacts:

Darwin Thomas