JBSA Lackland Air Handler Unit
Process Number FA301622U0041
Dates:
FA301622U0041
Department/Ind. Agency:DEPT OF DEFENSE
Sub-tier:DEPT OF DEFENSE
Sub Command:FA3016 502 CONS CL
Office:FA3016 502 CONS CL
General Information:
(utc-06:00) central standard time, chicago, usa
Updated Published Date:feb 07, 2022 02:05 pm cst
Original Published Date:0000-00-00 00:00:00
Original Response Date:jan 28, 2022 01:00 pm cst
Inactive Policy:15 days after date offers due
Updated Inactive Date:feb 25, 2022
Original Inactive Date:feb 12, 2022
Initiative:- None***--***
Classification:
total small business set-aside (far 19.5)
Product Service Code:j041 - maint/repair/rebuild of equipment- refrigeration, air conditioning, and air circulating equipment
NAICS Code:238220 - plumbing, heating, and air-conditioning contractors
Description:
The Contractor shall be responsible for all required materials, equipment andpersonnel to manage, administer, and supervise the project. All workmanshipshall be of good quality and performed in a skillful manner as determined by theProject Manager (PM). Contractor shall remove existing motor and blowerassembly. Install 2 Geenheck Model Plenum fans (Vari-green EC motor, dial forbalancing) or equal to. Contractor shall modify the electrical to accommodatethe new motors for the AHU. Contractor shall retrofit new bower assembly,create a wall in the AHU, and blank off any gaps to create a discharge plenum tobe installed. Contractor shall repair any items required for testing the operationof Air Handlers mechanically, and make necessary electrical modifications fornew motors at Building 2000 rear mechanical room. Contractor shall supply thematerials and service described in this document below. All work shall beconducted in compliance with the American Society of Heating and Air-Conditioning Engineers (ASHRAE) standards. This is a turnkey install and startup. Contract shall result in a fully operational system. 502 CE shall not provideany materials, tools or equipment. The RFQ has been amended to incorporate the updated Wage Determination. 25 Jan 2022 @ 0830 The RFQ has been amended to update new RFQ due date and question due date. 25 Jan 2022 @ 1110 The RFQ has been amended to update new RFQ due date to allow time to answer questions from site visit. 02 Feb 2022 @ 0800 The RFQ has been amended to update new version of SOW and post Q&A from Site Visit. 07 Feb @ 0845
Attachments / Links:
| Document | Size | Updated date | Download |
|---|
Contact Information:
CP 210-671-3617 1655 SELFRIDGE AVE BLDG 5450
JBSA LACKLAND , TX 78236-5286
USA
Primary Point of Contacts:TSgt Jerremy Smith
Secondary Point of Contact:Lauren Macias