Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

S201--WINDOW CLEANING AND OTHER BUILDING SERVICE

Process Number 36C26222R0068

USA

Dates:


Notice ID:

36C26222R0068

Department/Ind. Agency:

VETERANS AFFAIRS, DEPARTMENT OF

Sub-tier:

VETERANS AFFAIRS, DEPARTMENT OF

Sub Command:

262-NETWORK CONTRACT OFFICE 22 (36C262)

Office:

262-NETWORK CONTRACT OFFICE 22 (36C262)

General Information:


All Dates/Times are:

(utc-07:00) pacific standard time, los angeles, usa

Updated Published Date:

mar 14, 2022 07:26 am pdt

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

mar 25, 2022 01:00 pm pdt

Inactive Policy:

manual

Updated Inactive Date:

apr 24, 2022

Original Inactive Date:

may 24, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

s201 - housekeeping- custodial janitorial

Description:


Original Set Aside:

Page 3 of 3 36C26220R0068 Amend 0002 Window Cleaning and Other Building Structure Question and Answers: Q1: Can the government provide the previous contract number for this requirement? A1: VA262-16-D-0181 Q2. Is the previous incumbent still in place? A2: No Q3: Does the government have a preference with regard to the "suitable preservation product" for the painted ventilation louvres and painted doors on the west wall of the facility? A3: No. Only requirement is to ensure it does not remove existing paint. Q4: Can the government clarify the requirement of the supervisor to improve valet services? A4: The supervisor will need to be provide services to prevent impact on patients being provided care. (If the vehicle is impeding on a walkway, blocking a parking spot, etc.) Q5: Who is the incumbent? A5: Carpet Master Q6: What is the annual value of the existing contract? A6: I cannot provide this information. Q7: What is the maximum height of windows from the ground? A7: Approximately 70 feet Q8: Are there structural anchors to support scaffolding? A8: No Q9: Can a site plan be provided to identify buildings? A9: See attached Q10: How many windows need cleaning? Inside and outside surfaces? A10: Approximately total of 560 windows inside and out is approximately 1,120 Q11: How can a site visit be arranged? A11: Site Visit was scheduled for Wednesday, March 9, 2022, at 9:00 a.m.

Attachments / Links:


Document Size Updated date Download

Contact Information:


335 E. German Rd SUITE 301

Gilbert , AZ 85297

USA

Primary Point of Contacts:

Alfreda Hunter