Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Z1DA--676-22-103 INSTALL NEW ELEVATOR B-23 (D)

Process Number 36C25222B0021

USA

Dates:


Notice ID:

36C25222B0021

Department/Ind. Agency:

VETERANS AFFAIRS, DEPARTMENT OF

Sub-tier:

VETERANS AFFAIRS, DEPARTMENT OF

Sub Command:

252-NETWORK CONTRACT OFFICE 12 (36C252)

Office:

252-NETWORK CONTRACT OFFICE 12 (36C252)

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

jan 31, 2022 09:14 am cst

Original Published Date:

0000-00-00 00:00:00

Updated Response Date:

feb 10, 2022 04:00 pm cst

Original Response Date:

feb 10, 2022 04:00 pm cst

Inactive Policy:

manual

Updated Inactive Date:

apr 11, 2022

Original Inactive Date:

may 11, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

z1da - maintenance of hospitals and infirmaries

NAICS Code:

541330 - engineering services

Description:


Original Set Aside:

Please Note the Tomah VAMC has decided to add a design component to this project. The PSC should be C1DA. This solicitation will be for the following design/ engineering services only: Provide Professional Architect / Engineer services to prepare/provide, construction drawings and specifications, cost estimates, and Construction Period Services (CPS) for the Install New Elevator B-23 project 676-22-103. A. Phase 1 - Analysis of space and utilities needed to Install new traction elevator. Provide building emergency power from existing emergency generator source and Install new stairwell adjacent to new elevator. A destructive hazardous materials survey will be accomplished by the A/E as part of this design. Building shall remain operational and Install New Elevator B-23 676-22-103 2 occupied during construction. Design firm must work with elevator manufacturer and other designated manufacturers throughout the design phases. a. Perform initial analysis, to include but not be limited to, the following areas: i. Space Requirements ii. Floor Loading iii. Power Requirements iv. UPS Requirements v. HVAC Loading vi. Plumbing Requirements vii. Compressed Air Requirements viii. Access Route (make sure the unit can be delivered into the shaft) 1. Elevator Loading 2. Door Width/Height Restrictions ix. New Unit and Accessory Space Requirements x. Existing Unit Relocation Space and Utility Requirements B. Phase 2 Preparation of Updated Construction Estimate a. Based on the Phase 1 results, prepare an updated construction costs estimate for the necessary utility and building renovation work. C. Phase 3 Preparation of Construction Plans and Specifications a. Prepare detailed architectural and engineering plans and specifications for the necessary utility and building renovation work. b. Prepare bidding documents to facilitate competitive bidding. Construction is set to occur late FY 22. A solicitation for the construction should be posted August 2022.

Attachments / Links:


Document Size Updated date Download

Contact Information:


GREAT LAKES ACQUISITION CENTER 115 S 84TH ST

MILWAUKEE , WI 53214

USA

Primary Point of Contacts:

amy.burger@va.gov