Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

JBSA Lackland Air Handler Unit

Process Number FA301622U0041

USA

Dates:


Notice ID:

FA301622U0041

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

FA3016 502 CONS CL

Office:

FA3016 502 CONS CL

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

feb 07, 2022 02:05 pm cst

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

jan 28, 2022 01:00 pm cst

Inactive Policy:

15 days after date offers due

Updated Inactive Date:

feb 25, 2022

Original Inactive Date:

feb 12, 2022

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

j041 - maint/repair/rebuild of equipment- refrigeration, air conditioning, and air circulating equipment

NAICS Code:

238220 - plumbing, heating, and air-conditioning contractors

Description:


Original Set Aside:

The Contractor shall be responsible for all required materials, equipment andpersonnel to manage, administer, and supervise the project. All workmanshipshall be of good quality and performed in a skillful manner as determined by theProject Manager (PM). Contractor shall remove existing motor and blowerassembly. Install 2 Geenheck Model Plenum fans (Vari-green EC motor, dial forbalancing) or equal to. Contractor shall modify the electrical to accommodatethe new motors for the AHU. Contractor shall retrofit new bower assembly,create a wall in the AHU, and blank off any gaps to create a discharge plenum tobe installed. Contractor shall repair any items required for testing the operationof Air Handlers mechanically, and make necessary electrical modifications fornew motors at Building 2000 rear mechanical room. Contractor shall supply thematerials and service described in this document below. All work shall beconducted in compliance with the American Society of Heating and Air-Conditioning Engineers (ASHRAE) standards. This is a turnkey install and startup. Contract shall result in a fully operational system. 502 CE shall not provideany materials, tools or equipment. The RFQ has been amended to incorporate the updated Wage Determination. 25 Jan 2022 @ 0830 The RFQ has been amended to update new RFQ due date and question due date. 25 Jan 2022 @ 1110 The RFQ has been amended to update new RFQ due date to allow time to answer questions from site visit. 02 Feb 2022 @ 0800 The RFQ has been amended to update new version of SOW and post Q&A from Site Visit. 07 Feb @ 0845

Attachments / Links:


Document Size Updated date Download

Contact Information:


CP 210-671-3617 1655 SELFRIDGE AVE BLDG 5450

JBSA LACKLAND , TX 78236-5286

USA

Primary Point of Contacts:

TSgt Jerremy Smith

Secondary Point of Contact:

Lauren Macias