Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Z--ROMO HQE WATERLINE REHAB PHASE 7 & 8

Process Number 140P1221R0014

USA

Dates:


Notice ID:

140P1221R0014

Department/Ind. Agency:

INTERIOR, DEPARTMENT OF THE

Sub-tier:

INTERIOR, DEPARTMENT OF THE

Sub Command:

IMR INTERMOUNTAIN REGION(1200)

Office:

IMR INTERMOUNTAIN REGION(1200)

General Information:


All Dates/Times are:

(utc-07:00) mountain standard time, denver, usa

Updated Published Date:

(utc-07:00) mountain standard time, denver, usa

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

feb 10, 2022 05:00 pm mst

Inactive Policy:

15 days after response date

Original Inactive Date:

feb 25, 2022

Initiative:
  • None***--***

Classification:


Product Service Code:

z2ne - repair or alteration of water supply facilities

NAICS Code:

237110 - water and sewer line and related structures construction

Description:


Original Set Aside:

EO14042 ROMO HQE WATERLINE REHAB PHASE 7 & 8 (1) Date: November 24, 2021 (2) Product or Service Code: Z2NE (3) Contracting Office Address: National Park Service Regional Office Serving Interior Regions 6, 7 & 8 Lakewood Major Acquisition Buying Office 12795 West Alameda Parkway PO Box 25287 Denver, CO 80225-0287 (4) Subject: REHAB WATER DISTRIBUTION SYSTEM HEADQUARTERS EAST PHASE 7 & 8 TORTILLA FLATS & SUNDANCE CIRCLE PMIS NO. 240839 & 306571 (5) Proposed Solicitation Number: 140P1221R0014 (6) Closing Response Date: December 31, 2021 (7) Contact Point or Contracting Officer: Marcia Fox (8) Description PROJECT DESCRIPTION / SUMMARY: The Work consists of the following: Base Contract: The Work includes replace existing 4-inch and 6-inch waterline with 6-inch, 4- inch and 2-inch high density polyethylene (HDPE) by open trench methods. Work includes furnishing and installation of fire hydrants, valves, and appurtenances, extending new service lines into existing buildings, installation of air release / vacuum valve vaults, placement of perforated drainage pipe in the same trench as waterlines, and pavement patching areas disturbed by waterline installation. Work also includes abandonment or removal of existing waterlines, fire hydrants, valves, valve vaults and appurtenances. Option A: The work includes the replacement of three (3) Air Release Vales along the supply line between Bear Lake Road and the Lead Tanks. This work includes the demolition, removal, and Option B: The Work includes parking area and site accessibility improvements at RV Site P along Sundance Circle. This work includes the grading, placement of concrete pavement, and crusher fines at RV Site P. The work also includes the relocation of RV utility hook ups at the site. (9) Period of Performance: Estimated Period of performance is 04/18/2022 ¿ 02/04/2023. Construction is estimated to take 270 days. (12) A description of the procedures to be used in awarding the contract: a. Estimated date of Request for Proposal release: 01/11/2022 b. The anticipated award date: 04/18/2022 (13) The Request for Proposal will be posted on www.SAM.gov Questions can be emailed to marcia_fox@nps.gov. (14) Place of Contract Performance: Project Location: This project is in Rocky Mountain National Park, Estes Park, Colorado. The project area near the Headquarters Area on the east side of the park, is approximately 3 miles southwest of Estes Park, CO. All work in this project is within the boundaries of the Utility Area Historic District, which is a culturally significant area. (15) Set-aside Status: Total Small Business Set-Aside. NAICS 237110 Water and Sewer Line and Related Structures Construction Size Standard $39.5 million (16) Estimated Construction Magnitude: Between $1,000,000 and $5,000,000. (17) Award shall be made in accordance with FAR Part 15 best value tradeoff source selection process to a responsible small business (see Subpart 9.1) (18) The Government anticipates awarding a single award Firm Fixed Price Contract

Attachments / Links:


Document Size Updated date Download

Contact Information:


12795 W ALAMEDA PARKWAY

DENVER , CO 80225

USA

Primary Point of Contacts:

Fox, Marcia