Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Snow Plowing at Barlow Ranger District Compound and Billy Bob Sno-Park

Process Number 1240BD22Q0019

USA

Dates:


Notice ID:

1240BD22Q0019

Department/Ind. Agency:

AGRICULTURE, DEPARTMENT OF

Sub-tier:

AGRICULTURE, DEPARTMENT OF

Sub Command:

MT BAKER SNOQUALMIE NATIONAL FOREST

Office:

MT BAKER SNOQUALMIE NATIONAL FOREST

General Information:


All Dates/Times are:

(utc-08:00) pacific standard time, los angeles, usa

Updated Published Date:

dec 20, 2021 08:37 am pst

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 27, 2021 01:00 pm pst

Inactive Policy:

manual

Updated Inactive Date:

sep 30, 2022

Original Inactive Date:

sep 30, 2022

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

z1lb - maintenance of highways/roads/streets/bridges/railways

NAICS Code:

238910 - site preparation contractors

Description:


Original Set Aside:

1. Scope of Work: The Contractor shall supply all labor, supervision, equipment, supplies, and services necessary to perform snow clearing for the Barlow Ranger District Compound as stated in Paragraph 8. Performance Work Statement. Additionally, the Contractor shall supply all labor, supervision, equipment, supplies and services necessary to plow the Dufur Mill Road beginning at milepost 14.53 and moving east to milepost 9.77 and including Billy Bob Sno-Park. The Contracting Officer’s Representative (COR) / Government Technical Monitor (GTM) will inspect all completed work according to the requirements stated in Paragraphs 8., 9., and Attachment 4 – Project Specifications. This solicitation contemplates a firm-fixed-price (FFP) award to one company only. 2. Project Location: USDA Forest Service, Mt. Hood National Forest, Barlow Ranger District, Oregon State (Wasco County) 3. Description of Work Areas: Barlow Ranger District Office Compound--District Office Compound is occupied year-round 5 days a week. The compound contains one administrative building, Carpenter Shop, covered fuel building, one fire garage, three residential houses, two warehouses, and paved surface roads throughout. Refer to Attachment 1. Billy Bob Sno-Park, Dufur Mill Road--Dufur Mill Road (Forest Road 44) beginning at the forest boundary and heading east to the entrance of Billy Bob Sno-Park and the sno-park itself. The sno-park consists of approximately 0.1 miles of gravel road, 4,200 square yards of gravel parking lot, a warming hut and a restroom. Refer to Attachment 2 and Attachment 3. 4. Period of Performance: This purchase order will include a base year plus four option years. The commencement date is the contract award date and the overall completion date (if all option years are exercised) is November 30, 2026. 5. Evaluation Factors for Award: Technical (Relevant Past Performance, Price, and Representations and Certifications. 6. Point of Contact: Contact the contracting officer for all questions related to this requirement.

Attachments / Links:


Document Size Updated date Download

Contact Information:


MT BAKER SNOQUALMIE NATIONAL FOREST 2930 WETMORE AVE SUITE 3A

EVERETT , WA 98201

USA

Primary Point of Contacts:

Brian A. Johnson, Contracting Officer