Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Steam Plant Upgrades - Projects B260 at Hill AFB

Process Number W9123822R0007

USA

Dates:


Notice ID:

W9123822R0007

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

US ARMY ENGINEER DISTRICT SACRAMENT

Office:

US ARMY ENGINEER DISTRICT SACRAMENT

General Information:


All Dates/Times are:

(utc-08:00) pacific standard time, los angeles, usa

Updated Published Date:

jan 07, 2022 03:11 pm pst

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

jan 14, 2022 07:00 am pst

Inactive Policy:

15 days after date offers due

Updated Inactive Date:

feb 05, 2022

Original Inactive Date:

jan 29, 2022

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

z2nb - repair or alteration of heating and cooling plants

NAICS Code:

236220 - commercial and institutional building construction

Description:


Original Set Aside:

Building 260 Steam Plant Upgrades at Hill AFB Solicitation # W9123822R0007 This requirement is a two-phase Design-Build Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for Building 260 Steam Plant Upgrades at Hill AFB. Project Description: The Contractor shall perform improvements and repair of boilers in Building 260 (B260) Hill AFB project. This project will include the replacement of eight existing boilers in B260 with new dual-fuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain “N+1” boiler redundancy in the plants. The boilers in B260 will be replaced with five new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. This will be a DB contract. In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be Between $25,000,000.00 and $100,000,000.00. The NAICS Code is 236220 - Commercial and Institutional Building Construction. The size standard is $39.5M. The Product Service Code is Z2NB – Repair or Alteration of Heating and Cooling Plants. This solicitation will proceed as a 100% Small Business Set Aside.

Attachments / Links:


Document Size Updated date Download

Contact Information:


KO CONTRACTING DIVISION 1325 J STREET

SACRAMENTO , CA 95814-2922

USA

Primary Point of Contacts:

John Wysocki

Secondary Point of Contact:

Deanna C. Zemovich